ON THIS PAGE YOU WILL FIND MONTHLY UPDATES ON THE PROGRESS OF THE WORKS IN BOMAL

The finish line is reached! (March 2010)

End of this month, the curtains were hanged up in the holiday cottages 1-2 and 3. Also in the first three holiday cottages, all furniture were placed. The first part of the garden was planted. Now, the first three holiday cottages "Le Rubis", "Le Saphir" and "L'Emeraude" are completely finished.

Living room Bunk bed Bedroom Bedroom Bathroom with steam shower Holiday cottages Le Rubis, Le Saphir and L'Emeraude

The sprint to the finish line has begun (February 2010)

In the first part the final run has started indeed. In the first house was, after placing the kitchen cupboards, also the granite working table placed. In the other houses it is only a matter of days. The walls have been given a color according to the name of the house. The light fixtures were hung up, which gives a nice finished view.

Living room Living room and woodstove Completely equipped kitchen Bedroom Wash basin Completely equipped kitchen Living room Completely equipped kitchen

The finishing of the houses is progressing little by little (January 2010)

In section one, the kitchen is installed, the empty spaces are filled with the kitchen appliances (microwave, cooking stove with double oven and ceramic cooking plate, a dishwasher and a refrigerator with freezer). The bathrooms were tiled in two colors and the installation of the whirlpools are started. They started with placing the interior doors in the first three houses.

Completely equipped kitchen Completely equipped kitchen Bathroom with massage bath Toilet Bathroom wiht steam shower Door

The interior finishing has started (December 2009)

End of November, all rooms were tiled in section 1. For the living rooms we opted for a grey stone and for the bedrooms we have chosen a beige stone. To continue in the Ardennes trend, we used for the stairs a black granite stone. To create a cozy atmosphere in the living rooms, we installed wood stoves with steatite. In the bedrooms we have started to install the wash-hands.

Woodstove Stairs Wash basin in the bedroom Wash basin in the bedroom Wash basin in the bedroom Completely equipped kitchen Completely equipped kitchen

The structural work is almost finished (October 2009)

A beautifully faade finished with Ardennes stones adorns the first house of the first section. The windows and doors are placed and inside the plastering is finished. The roof of the second section is done. The roofing on the third section are still in full swing. Let us hope that the weather gods will us be kindly disposed so we can start finishing the interior.

Terrace of Le Rubis Facade L'Emeraude Living room L'Emeraude Holiday cottages L'Opale and La Topaze Holiday cottages L'Opale and La Topaze Holiday cottages La Cornaline, L'Opale, La Topaze and Le Jade Roof of La Cornaline L'Opale

A beautiful result (September 2009)

The façade and the roof of the first section are now completely finished and it gives a nice result. Around the arched window we can find some nice details. The next floor is placed in the second section.

Facade Le Rubis Facade Le Rubis Holiday cottages Le Rubis, Le Saphir and L'Emeraude Holiday cottages La Cornaline and L'Opale Facade Le Rubis Living room Le Rubis Holiday cottages La Cornaline and L'Opale Holiday cottages La Cornaline, L'Opale, La Topaze and Le Jade

A new start (August 2009)

Holidays were finished and the works restarted. They worked a lot on the roofing of section one, so it went on quickly. Meanwhile the rest of the façade was build, also the parts with the typical Ardennes stones. Also in the second section, they were busy to build the bricks. Also this month the first floor of section three started.

August 2009 August 2009 August 2009 August 2009 August 2009 August 2009 August 2009 August 2009

Holidays (July 2009)

In July we stop the work for a few weeks to enjoy a well deserved vacation to start again in August with a lot of courage.

Progress(June 2009)

Leaving June behind, it is time for a little update on the progress of the works. The structural work of the first section is completely finished and a few bricks are already build. Also the rest in going well. The structural works of the second section is almost finished and the foundations of section three are made.

June 2009 June 2009 June 2009 June 2009

A faster acceleration and a floor higher (May 2009)

The end of April the first floor is finished. When the ceiling of the first floor is finished, they are moving to a higher acceleration. The second floor is going fast. A second team will reinforce very soon. The housing will shoot from the ground like mushrooms.

May 2009 May 2009 May 2009 May 2009

The first pit (April 2009)

In the first week of March 2009 was the symbolic first shovel earth a fact. The project takes more definite form. Standing on the site, it is easy to imagine the first houses and start dreaming of the final result. From now on, the works will go on quickly. Just one week later, the foundations of the first section have started. Another week or two later, the first floor is almost finished. We already put some pictures on a row.

April 2009 April 2009 April 2009 April 2009 April 2009 April 2009 April 2009 April 2009